Construction Scheduling and Cost Control

Construction Scheduling and Cost Control

Planning: Process of choosing the method and order of work
Scheduling: Process of determining the interrelationship of associated timings of operations.

Steps in Construction Scheduling:

  • 1-Splitting of the project into work activities 
  • 2-Determining logic relationships/interrelationships between activities.
  • 3-Construction of Network Diagrams.
  • 4-Assigning durations to work activities.
  • 5-CPM Calculations resulting in start times, finish times and float calculations of activities.
  • 6-Marking of Critical Path
  • 7-Construction of Bar Charts Time-phased diagrams