![]() |
| Schedule Delay Analysis in Construction Projects |
Various methods have been developed and used for analyzing and measuring construction schedule delays. However, these methods have different analytical approaches and require different information. For a complicated delay case, different method may provide different results, and require different input data.
That is, no single method is universally accepted by all project participants, suitable for all situations. Therefore, there is a need to provide complete information on available delay methods for a delay analyst while he/she wants to select a suitable method to resolve his/her delay problems.
Types of Construction Delay:
1-Basic Distinctions:
- Excusable and Non-Excusable
- Compensable and Non-Compensable
- Concurrent and Non-Concurrent
- Critical versus Non-Critical
Download also:
2-Excusable Delays:
- General labor strikes
- Fires, floods and other natural disasters
- Owner directed changes
- Errors and omissions in the plans and specifications
- Differing site conditions or concealed conditions
- Lack of action by government bodies
- Intervention by outside agencies

It was nice keep it up
ردحذفIf you have holistic project inform me
إرسال تعليق