Construction Project Scheduling with Time, Cost, and Material Restrictions Using Critical Path Method

Construction Project Scheduling with Time, Cost, and Material Restrictions Using Critical Path Method

Construction Project Scheduling with Time, Cost

This book evaluates the viability of using fuzzy mathematical models for determining construction schedules and for evaluating the contingencies created by schedule compression and delays due to unforeseen material shortages. 

Networks were analyzed using three methods: manual critical path method scheduling calculations, Primavera Project Management software (P5), and mathematical models using the Optimization Programming Language software. 

Fuzzy mathematical models that allow the multiobjective optimization of project schedules considering constraints such as time, cost, and unexpected materials shortages were used to verify commonly used methodologies for finding the minimum completion time for projects. 

The research also used a heuristic procedure for material allocation and sensitivity analysis to test five cases of material shortage, which increase the cost of construction and delay the completion time of projects. 

From the results obtained during the research investigation, it was determined that it is not just whether there is a shortage of material but rather the way materials are allocated to different activities that affect project durations. 

It is important to give higher priority to activities that have minimum float values, instead of merely allocating materials to activities that are immediately ready to start.
Download also:

Post a Comment

أحدث أقدم