Five-Level Work Breakdown Structure


The Work Breakdown Structure (WBS) is exemplified using a simple five-level plan. Top-down budgeting and allocation of team skills are demonstrated in connection to the WBS.

Why Work Breakdown Structure is important?

The WBS makes the deliverables more precise and concrete so that the project team knows exactly what has to be accomplished within each deliverable. This also allows for better estimating of cost, risk, and time because you can work from the smaller tasks back up to the level of the entire project.

SEE: How to Create a Work Breakdown Structure (WBS) in Excel

Share on :

Author :

No comments:

Post a Comment

live stream

Live stream with us at 7 pm

730

Cairo

2230

KSA

Engineering Management it is the frist Blog share free materials to learn project management and it is the best blog in the world share the knoweldge in this field by a teamwork of Manager, we are work to help our people interested to learn project management and help you to get pmp certificate or any other certificate.
Email: engsaidragab@gmail.com
All Rights Reserved ENGINEERING MANAGEMENT
Designed by